House Foods
Garden Grove, CA
KCS West has provided multiple construction services at this location. Projects include:
- Design/Build services for the 141,800 sf tofu manufacturing facility which included refrigeration and freezer storage rooms, office and warehousing, steam, hot water, chilled water and compressed air systems.
- Design/Build services for the addition of two process lines in 24,000 sf of existing warehouse area. Work was performed with existing process lines in production. Process equipment installation performed by PMD.
- Design/Build tenant improvement work to upgrade utilities and equipment in preparation for the delivery of a new owner furnished/owner installed boil cool tofu making machine.
- Addition of a refrigeration area (cooler storage) within the existing warehouse (approximately 4,100 sf), and renovation of an existing shipping office area.