Cold Film Vault
Burbank, CA
KCS West is provided general contracting services for the construction of a new, single story 8,000 sf film storage vault. Work includes demolition of existing buildings, relocation of utilties, new construction, sophisticated mechanical systems to maintain cold (35 degrees F) and low humidity (20%) conditions for safe and stable storage of film archive. Fire protection system is also sophisticated and invovles inergen, hypoxic and other systems.
This project is located on a major film and animation studio campus.